Saturday 12 October 2013

Levelling and irrigation

A final levelling of the ground for the trees and grass, and then the trenches were dug for the irrigation.  Pumps were then installed and pipes laid.  Stew has been a busy project manager and has put a lot of graft in too.





Monday 7 October 2013

A break in the weather

We've had a break in the weather and the lime is finally spread.  Another job done.

Tuesday 1 October 2013

Quiet contemplation

Stew thinking about his next move as captured through the kitchen window.  At this stage we have lime spread, irrigation ditches dug and sand spread ready for the grass to grow.