A final levelling of the ground for the trees and grass, and then the trenches were dug for the irrigation. Pumps were then installed and pipes laid. Stew has been a busy project manager and has put a lot of graft in too.
Saturday, 12 October 2013
Monday, 7 October 2013
Tuesday, 1 October 2013
Quiet contemplation
Stew thinking about his next move as captured through the kitchen window. At this stage we have lime spread, irrigation ditches dug and sand spread ready for the grass to grow.
Sunday, 8 September 2013
Saturday, 24 August 2013
Would you like lime with that?
A semi trailer load of lime was delivered in August and it was a pretty tricky manoeuvre to get it onto the block with a couple of narrow turns on the drive. It was a rare sunny Winter's day and we had a couple of weeks solid rain after this but luckily not too much washed away thanks to Stew's tarp work.
Monday, 19 August 2013
Tuesday, 23 July 2013
I think this is a great promo for Dunsborough Dingo Hire! Steve's machines have been a semi permanent fixture on the block.
Subscribe to:
Posts (Atom)